Painting the carports

Above two pics of Carport #1.  Yesterday I offered to Matt (who teaches at St Pius College, Chatswood) who has two young daughters, to assist him move the above items away from the walls.
I am confident with a day's notice, Matt and I can relocate the above items at least 1 metre away from the walls and supporting concrete columns.

Four storage cabinets in #3 carport.  The bicycle on RHS is being put out on nature strip on 8 May for collection by Council on 9 May.

One taller metal cabinet in carport #7.  I have a good rapport with Bill and Lyndal Robson, who are both avid scuba divers. 
Should the Strata Committee require the above five cabinets (4 + 1) removed from adjacent the rear wall, I will attempt to talk to Bill and/or Lyndal and offer to assist move the above metal cabinet at least 1 metre from the wall.

The above three pics evidence that Paolo Redito (Unit 4) has done a fine job in moving all his possessions away from the two walls. 
As Paolo and his wife fly out on 6 May, it would be beneficial to them if the painting of walls near their two carports could be completed this week, or by 4th May.

 

 

 

[bottom.htm]